{"page":{"id":77,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://hearthcustoms.com/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-10-06\">6 October 2026</time></p>\n<p>Every Hearth Customs piece is printed with the names and dates you typed, so the minutes after you place an order are the only time a change is free and simple. This page explains the 24-hour window, exactly what you can change inside it, what happens once a piece is in production, and what your options are after that. It is written to agree with the <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a>, <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges</a> and <a href=\"/refund-policy/\">Refund Policy</a> pages. If you need to change something right now, skip to section 2 and email <a href=\"mailto:support@hearthcustoms.com\">support@hearthcustoms.com</a> with your order number.</p>\n<section class=\"policy-summary\">\n<h2>Cancellations and changes at a glance</h2>\n<ul>\n<li>You can cancel or change any order within 24 hours of placing it, provided the piece has not yet been printed.</li>\n<li>Changes include names, dates, spelling, size, colour, style, quantity, shipping address and gift note.</li>\n<li>Email us; we confirm within 1 business day. A cancellation inside the window is refunded in full within 7 business days.</li>\n<li>Once a personalised piece is printed, it cannot be changed, but it can still be returned under the 60-day rule once it arrives, with return postage paid by us.</li>\n<li>Address changes are possible until the carrier collects the parcel; after that we try a redirect.</li>\n</ul>\n</section>\n<h2>1. Why 24 hours</h2>\n<p>Production at Hearth Customs starts on the next business day after an order is placed and takes 1–3 business days. The 24-hour window exists so that an order placed at 9 pm can be corrected the next morning before it reaches the printer. We hold every order for at least 24 hours before it enters the print queue, including orders placed on Friday, which do not start until Monday. That means an order placed on Saturday morning can actually be changed until Monday morning; the 24 hours are a minimum, not a cut-off we enforce against you.</p>\n<p>The reason the window cannot be longer is simple: once a blanket with eight names has been printed, we cannot sell it to anyone else. A wrong spelling discovered after printing becomes a reprint at our cost or a return at yours, and neither is as good as a quick email before the print run. So: check the preview on the product page, check the order confirmation email, and if anything is wrong, write to us straight away.</p>\n<h2>2. How to cancel or change an order</h2>\n<ol>\n<li><strong>Find your order number.</strong> It is in the subject line of your order confirmation email and in your account under Orders if you created one.</li>\n<li><strong>Email <a href=\"mailto:support@hearthcustoms.com\">support@hearthcustoms.com</a></strong> with the subject &#8220;Change order #12345&#8221; or &#8220;Cancel order #12345&#8221;, or use the <a href=\"/submit-ticket/\">Submit Ticket</a> page and pick the &#8220;Change or cancel an order&#8221; category. Say exactly what should change, written out in full: &#8220;The name on the mug should be Elinor, not Eleanor&#8221;, &#8220;Change the blanket to 60 x 80 in&#8221;, &#8220;Ship to 14 Oak Lane instead&#8221;.</li>\n<li><strong>We reply within 1 business day</strong>, usually within a few hours on a weekday. If the piece has not been printed, we make the change and send you an updated confirmation. If a change alters the price (a larger blanket, a second mug), we send a payment link for the difference or refund the difference, whichever applies.</li>\n<li><strong>For a cancellation</strong>, we confirm by email and issue a full refund within 7 business days to the original payment method. The mechanics of refunds are on the <a href=\"/refund-policy/\">Refund Policy</a> page.</li>\n</ol>\n<p>The request is counted from the time your email arrives, not from the time we read it. If you email at 11 pm on day one and we read it at 8 am on day two, you are inside the window.</p>\n<h2>3. What you can change inside the window</h2>\n<table>\n<caption>Changes inside 24 hours, before printing</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Possible?</th>\n<th scope=\"col\">Price effect</th>\n<th scope=\"col\">Note</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Spelling of a name, a date, a line of text</td>\n<td>Yes</td>\n<td>None</td>\n<td>Write the corrected text in full; we copy it exactly</td>\n</tr>\n<tr>\n<td>Size (blanket, pillow, doormat, tee)</td>\n<td>Yes</td>\n<td>Difference charged or refunded</td>\n<td>Check the <a href=\"/size-guide/\">Size Guide</a> first</td>\n</tr>\n<tr>\n<td>Colour, fabric style, ornament material</td>\n<td>Yes</td>\n<td>Difference if any</td>\n<td>Some fabrics change the print area slightly; we tell you</td>\n</tr>\n<tr>\n<td>Quantity up or down</td>\n<td>Yes</td>\n<td>Difference charged or refunded</td>\n<td>Adding an item restarts the 24 hours for that item only</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>Yes, until collection</td>\n<td>None</td>\n<td>Must stay in the US, Canada, Australia or New Zealand</td>\n</tr>\n<tr>\n<td>Gift note</td>\n<td>Yes, until packing</td>\n<td>None</td>\n<td>Printed on the packing slip, no prices shown</td>\n</tr>\n<tr>\n<td>Payment method</td>\n<td>No</td>\n<td>—</td>\n<td>Cancel and reorder instead</td>\n</tr>\n<tr>\n<td>Swap to a different product</td>\n<td>Yes, as cancel + new order</td>\n<td>New price</td>\n<td>We cancel the first and refund it in full</td>\n</tr>\n</tbody>\n</table>\n<h2>4. After the window: once a piece is in production</h2>\n<p>When the 24 hours have passed and the piece has entered the print queue, we can no longer change the personalisation, size, colour or style. We are honest about why: by then the file has been prepared and, in most cases, printed. What you can still do:</p>\n<ul>\n<li><strong>Change the shipping address</strong> until the carrier collects the parcel. Email us; if the label has not been printed we simply change it. If the parcel has been collected, we ask the carrier for a redirect, which works in many US regions and in some cities abroad, and we tell you the outcome within 1 business day.</li>\n<li><strong>Add or change the gift note</strong> until the parcel is packed, usually the day it ships.</li>\n<li><strong>Return the piece after delivery</strong> under the 60-day rule on the <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges</a> page. Return postage is on us even for change of mind, and the refund is in full. If the problem is a wrong date you typed, the fastest fix is to order the corrected piece now and return the first when it arrives; you are never left with nothing.</li>\n<li><strong>Refuse delivery.</strong> If you refuse the parcel at the door it comes back to us and we refund it in full on arrival. This is slower than a normal return and we do not recommend it, but it is your right.</li>\n</ul>\n<p>A worked example: a 15 oz mug for a father whose &#8220;Est. 1989&#8221; was typed as &#8220;1998&#8221;. If the customer emails within 24 hours, we fix it and nothing else changes. If they notice on day 5 when the shipping confirmation arrives, we cannot reprint the mug already in the box, but we send a link to order the corrected mug, ship it free in 1–3 business days, and refund the first mug when it comes back on our prepaid label. The customer is out of pocket for the second mug only until the first one is refunded.</p>\n<h2>5. Cancelling part of an order</h2>\n<p>You can cancel one item from a multi-item order inside the window; the rest ships as planned and the cancelled item is refunded within 7 business days. If the order had a discount code with a minimum spend and the remaining items fall below that minimum, we recalculate the discount honestly and tell you the new total before confirming; you can then cancel the whole order instead if you prefer.</p>\n<h2>6. Orders we cancel</h2>\n<p>Very rarely we have to cancel an order ourselves: a fabric colour runs out with no substitute you would accept, a personalisation request includes a trademarked logo or a real team name we cannot legally print (see the <a href=\"/intellectual-property-policy/\">Intellectual Property Policy</a>), a shipping address turns out to be outside the four countries we serve, or our payment processor flags the transaction. In each case we email you before cancelling, explain, and offer an alternative where one exists. If we cancel, the refund is issued within 7 business days of the cancellation email, in full.</p>\n<h2>7. Changing an order placed as a guest</h2>\n<p>Guest orders can be changed exactly like account orders. Email from the address you used at checkout, or quote the order number and the postcode of the shipping address so we can verify it is your order. We do not make changes to an order on the request of a third party unless they can quote both the order number and the postcode.</p>\n<h2>8. Timing summary</h2>\n<table>\n<caption>What is possible, by stage</caption>\n<thead>\n<tr>\n<th scope=\"col\">Stage</th>\n<th scope=\"col\">Typical timing</th>\n<th scope=\"col\">Personalisation / size / colour</th>\n<th scope=\"col\">Address</th>\n<th scope=\"col\">Cancel</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Order placed, within 24 hours</td>\n<td>Day 0–1</td>\n<td>Free change</td>\n<td>Free change</td>\n<td>Full refund</td>\n</tr>\n<tr>\n<td>In production</td>\n<td>Day 1–3 (business days)</td>\n<td>Not possible</td>\n<td>Free change until collection</td>\n<td>Not possible; return after delivery</td>\n</tr>\n<tr>\n<td>Shipped</td>\n<td>Day 2–4 onward</td>\n<td>Not possible</td>\n<td>Redirect requested</td>\n<td>Refuse or return after delivery</td>\n</tr>\n<tr>\n<td>Delivered</td>\n<td>US 7–14, CA/AU/NZ 7–14 business days after shipping</td>\n<td>Reorder + return</td>\n<td>—</td>\n<td>60-day return, free postage</td>\n</tr>\n</tbody>\n</table>\n<h2>9. Getting the personalisation right the first time</h2>\n<p>Most change requests we receive are about text, so here is the short list we wish everyone read before clicking &#8220;Place order&#8221;. Type names exactly as they should appear, including capital letters, accents and hyphens; &#8220;Mary-Jo&#8221; and &#8220;Mary Jo&#8221; print differently. Write dates in the format you want to see: &#8220;06.14.2019&#8221;, &#8220;June 14, 2019&#8221; and &#8220;14 June 2019&#8221; are all fine, but we will not convert one into another. If an item has two fields, such as a name and a short line, keep each to the field it belongs in; text typed into the wrong box prints in the wrong place. For a family blanket with many names, list them in the order you want them printed, separated by commas, and count them against the product&#8217;s maximum before ordering.</p>\n<p>When you are unsure how something will look, write &#8220;please send a proof&#8221; in the order notes. We email a proof before production and the 24-hour window pauses until you reply, so you lose nothing by asking. This is especially useful for memorial pieces, long names and anything going to someone who will notice a wrong letter. A proof is free.</p>\n<h2>10. When the change is our mistake</h2>\n<p>If you asked for a change inside the window and the item still arrives with the old text, size or colour, that is our error and it is not a change-of-mind situation. Photograph the item and the confirmation email we sent, email us, and we reprint the correct piece at no cost and ship it free within 1–3 business days. You do not need to send the wrong one back. The full rules for errors are in section 4 of the <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges</a> page.</p>\n<h2>11. Orders placed for a deadline</h2>\n<p>If your order is for a fixed date, a change made inside the window does not delay it: the piece still enters production on the next business day and is made within 1–3 business days. A change made after we have sent you a proof, or a change of product, may restart production for that item, and we say so in our reply so you can judge whether the date still works. Check the delivery table on the <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page before you decide between correcting an order and keeping it as it is.</p>\n<h2>12. Need a hand?</h2>\n<p>Email <a href=\"mailto:support@hearthcustoms.com\">support@hearthcustoms.com</a> with the order number in the subject line, or use the <a href=\"/submit-ticket/\">Submit Ticket</a> page. We reply within 1 business day. To check where your order is in the process, use <a href=\"/order-tracking/\">Order Tracking</a>; for the most-asked questions, see the <a href=\"/faqs/\">FAQs</a> or the <a href=\"/help-center/\">Help Center</a>.</p>\n","visible_characters":10268,"meta_description":"Fix a name, date, size or address free within 24 hours of ordering, before printing. What you can change, how to ask, and your options once a piece is printed.","parent":null,"published_at":"2026-10-06T04:27:01+00:00","updated_at":"2026-10-06T04:27:01+00:00"}}